A Stakeholder Analysis of the KLIA2 Airport Terminal Project

Authors

  • Nor Azlina Mohd Isa Arshad Ayub Graduate Business School, Universiti Teknologi MARA, 40450 Shah Alam, Malaysia
  • Norlida Abdul Hamid Arshad Ayub Graduate Business School, Universiti Teknologi MARA, 40450 Shah Alam, Malaysia
  • Tan Peck Leong Arshad Ayub Graduate Business School, Universiti Teknologi MARA, 40450 Shah Alam, Malaysia

DOI:

https://doi.org/10.21834/e-bpj.v1i3.372

Keywords:

Stakeholder Theory, Airport Stakeholders, Airport Terminal, Project Management

Abstract

Managing an airport terminal project is complex, due to a large number of stakeholders involved. Airport stakeholders include many organisations and individuals, making it a collaborative service environment. Stakeholder theory denotes that organisation should strive to create value for all its stakeholders without the need to trade off. The purpose of this study is to identify the respondents to measure the collective perspectives of the KLIA2 airport terminal project. This is an overview of the literature relating to the stakeholder theory and identification of the stakeholders for an airport terminal project in general and specifically for the KLIA2 terminal.

References

AG to audit klia2. (2015, May 23). New Straits Times (Malaysia)

Argandoña, A. (2011). Stakeholder theory and value creation, Working Paper, WP-922. DOI: https://doi.org/10.2139/ssrn.1947317

Bezerra, G.C.L. & Gomes, C.F. (2015). The effects of service quality dimensions and passengers characteristics on passenger's overall satisfaction with an airport. Journal of Air Transport Management, 44 - 45, 77 - 81. DOI: https://doi.org/10.1016/j.jairtraman.2015.03.001

Bogicevic, V., Yang, W., Bilgihan, A. & Bujisic, M. (2013), Airport service quality drivers of passenger satisfaction. Tourism Review, 68(4), 3 - 18. DOI: https://doi.org/10.1108/TR-09-2013-0047

Brady, T., & Davies, A. (2010). From hero to hubris - Reconsidering the project management of Heathrow's Terminal 5. International Journal of Project Management, 28(2), 151-157. DOI: https://doi.org/10.1016/j.ijproman.2009.11.011

Davis, K. (2014). Different stakeholder groups and their perceptions of project success. International Journal of Project Management, 32(2), 189-201. DOI: https://doi.org/10.1016/j.ijproman.2013.02.006

Dohnalová, Z., & Zimola, B. (2014). Corporate Stakeholder Management. Procedia - Social and Behavioral Sciences, 110, 879-886. DOI: https://doi.org/10.1016/j.sbspro.2013.12.933

Fageha, M. K., & Aibinu, A. a. (2013). Managing Project Scope Definition to Improve Stakeholders' Participation and Enhance Project Outcome. Procedia - Social and Behavioral Sciences, 74, 154-164. DOI: https://doi.org/10.1016/j.sbspro.2013.03.038

Finch, P. (2003). Applying Slevin-Pinto Project Implementation Profile to an Information Systems Project. Project Management Journal, 34(3), 32-39. DOI: https://doi.org/10.1177/875697280303400305

Fitrijanti, T. (2015). Index of the Company's Stakeholders Welfare. Procedia - Social and Behavioral Sciences, 211(September), 1023-1027. DOI: https://doi.org/10.1016/j.sbspro.2015.11.136

Freeman, R.E, Harrison, J.S., Wicks, A.C, Parmar, B. & Simone de Colle. (2010). Stakeholder Theory: The State of the Art. New York. Cambridge University Press. DOI: https://doi.org/10.1017/CBO9780511815768

Freeman, R.E (1984). Strategic Management: A Stakeholder Approach. Boston. Pitman Publishing Inc.

Harrison, A., Popovic, V., Kraal, B. J., & Kleinschmidt, T. (2012). Challenges in passenger terminal design : A conceptual model of passenger experience. Proceedings of the Design Research Society, 344-356.

Hussein, H., & Yaacob, N. M. (2013). Malaysian perspective on the development of accessible design, Asian Journal of Environment-Behaviour Studies, 4(12), 101-116.

Johansen, A., Eik-Andresen, P., & Ekambaram, A. (2014). Stakeholder Benefit Assessment - Project Success through Management of Stakeholders. Procedia - Social and Behavioral Sciences, 119(1877), 581-590. DOI: https://doi.org/10.1016/j.sbspro.2014.03.065

Kamaruddin, R., Osman, I., Anizaliana, C., & Pei, C. (2012). Customer expectations and its relationship towards public transport in Klang Valley. Journal of Asian Behavioural Studies, 2, 10. DOI: https://doi.org/10.21834/jabs.v2i4.204

Key, S. (1999). Toward a new theory of the firm: a critique of stakeholder “theory.†Management Decision, 37(4), 317-328. DOI: https://doi.org/10.1108/00251749910269366

Kivits, R. A. (2011). Multi-dimensional stakeholder analysis : a methodology applied to Australian capital city airports, International Journal of Multiple Research Approaches. 5(3), 318 - 333. DOI: https://doi.org/10.5172/mra.2011.5.3.318

Prime minister launches world's largest purpose built terminal - klia2 (2014, June 24). http://www.malaysiaairports.com.my (Retrieved on 8th February 2016)

Project Management Institute. (2013). A guide to project management body of knowledge (PMBOK guide). Newton Square, Pa: Project Management Institute DOI: https://doi.org/10.1002/pmj.21345

Rosacker, K. M., Zuckweiler, K. M., & Buelow, J. R. (2010). An empirical evaluation of hospital project implementation success. Academy of Health Care Management Journal VO - 6, 6(1), 37.

Schaar, D. & Sherry. L. (2010). Analysis of Airport Stakeholders, Integrated Communications Navigation and Surveillance Conference (ICNS), J4 1-17. DOI: https://doi.org/10.1109/ICNSURV.2010.5503233

Sözüer, M., & Spang, K. (2014). The Importance of Project Management in the Planning Process of Transport Infrastructure Projects in Germany. Procedia - Social and Behavioral Sciences, 119(0), 601-610. DOI: https://doi.org/10.1016/j.sbspro.2014.03.067

Stieb, J. A. (2009). Assessing Freeman's stakeholder theory. Journal of Business Ethics. 87, 401-414. DOI: https://doi.org/10.1007/s10551-008-9928-4

Toor, S.-R. & Ogunlana, S. O. (2009). Construction professionals' perception of critical success factors for large-scale construction projects. Construction Innovation: Information, Process, Management, 9(2), 149-167. DOI: https://doi.org/10.1108/14714170910950803

Turner, R. & Zolin, R. (2012). Forecasting success on large projects: developing reliable scales to predict multiple perspectives by multiple stakeholders over multiple time frames, Project Management Journal, 43(5), 87 - 99. DOI: https://doi.org/10.1002/pmj.21289

Yang R.J. & Shen, G.Q.P. (2014). Framework for stakeholder management in construction projects. Journal of Management in Engineering, 31(4), 1-14. DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000285

Downloads

Published

2016-08-03

How to Cite

Mohd Isa, N. A., Abdul Hamid, N., & Leong, T. P. (2016). A Stakeholder Analysis of the KLIA2 Airport Terminal Project. Environment-Behaviour Proceedings Journal, 1(3), 281–289. https://doi.org/10.21834/e-bpj.v1i3.372

Issue

Section

Travel / Transportation Environment