[1]
Mohd Kamar, I.F. et al. 2017. Preliminary Survey of Safety and Health Cost Framework for Urban Rail Infrastructure Project in Malaysia. Environment-Behaviour Proceedings Journal. 2, 5 (Mar. 2017), 485–492. DOI:https://doi.org/10.21834/e-bpj.v2i5.712.