Mohd Isa, N. A., Abdul Hamid, N. and Leong, T. P. (2016) “A Stakeholder Analysis of the KLIA2 Airport Terminal Project”, Environment-Behaviour Proceedings Journal, 1(3), pp. 281–289. doi: 10.21834/e-bpj.v1i3.372.